We planted as many as possible trees surrounding the hospital. Trees with wide leaves create shady areas and cool breezes pass-through inside hospital corridors.
Wacana, pikiran, pekerjaan, reportase dan laporan pandangan mata-cepat dari sudut pandang saya pribadi mengenai kegiatan Ikatan Dokter Indonesia (IDI) dan berbagai aktivitas pribadi. Ini hanya berupa pandangan pribadi tidak terkait dengan pihak manapun.
On 27-28 April 2006, water plant treatment (1.5 liter per second) has been installed. Sources of water: Ground water, pond and reuse from waste treatment facility. Rain water from roof of the building is conserved by collecting and injecting into ground water through 3 (three) wells (deep: 15-30 meters).

Board of Directors of Hasan Sadikin Hospital, Bandung agreed to the proposed design, created by PT Pandu Persada, Bandung. Estimated budget: Rp 2,300,000,000. Some of the budget will be supported by Hasan Sadikin Hospital.

